Iona Island Waste Water Treatment Plant – cost optimized screening and degrit

Iona Island Waste Water Treatment Plant – cost optimized screening and degrit

About this project

Knowing that a full treatment plant replacement was years away, this temporary screening and degrit facility and its four associated pump stations prolong the useablity of the existing Iona Island treatment plant.

The functional, cost optimized and visually appealing design was developed working closely with CH2M.

Architect: Martin Nielson, DIALOG
SLA’s Role: Project Architect while at DIALOG

Project features:
Infrastructure
Cost optimized

Details

Tags:  cost optimized, Infrastructure, Kingspan, screening, waste water